Skip to main content
DigiCalcs

Cara Menghitung Va R

learn.whatIsHeading

Value at Risk (VaR) estimates maximum loss over time period at confidence level (e.g., 95% confident loss won't exceed $X in one day).

Panduan Langkah demi Langkah

  1. 1Input returns history or parameters
  2. 2Calculate percentile loss
  3. 3Report VaR at chosen confidence level

Contoh Terpecahkan

Masukan
$1M portfolio, 95% confidence
Hasil
95% VaR ≈ $50k/day (5% chance of larger loss)
Risk measure used by banks

Kesalahan Umum yang Harus Dihindari

  • Assuming VaR captures all downside
  • Not updating with new volatility regime

Pertanyaan yang sering diajukan

Doesn't VaR underestimate tail risk?

Yes, doesn't show loss magnitude beyond confidence level; use CVaR (expected shortfall) too.

Siap menghitung? Coba Kalkulator Va R gratis

Cobalah sendiri →

Pengaturan

PrivasiKetentuanTentang© 2026 DigiCalcs