Cara Menghitung Reorder Point
learn.whatIsHeading
Calculates the inventory level at which to place a new order to avoid stockouts. Accounts for lead time and demand variability.
Rumus
Formula: reorder point = (D × LT) + SS
- D
- D value — Variable used in the calculation
- LT
- LT value — Variable used in the calculation
- SS
- SS value — Variable used in the calculation
Panduan Langkah demi Langkah
- 1Average daily demand (D)
- 2Lead time in days (LT)
- 3Safety stock (SS)
- 4Formula: reorder point = (D × LT) + SS
- 5Reorder when inventory reaches this level
Contoh Terpecahkan
Masukan
50/day use, 5day lead
Hasil
Order at 250
Kesalahan Umum yang Harus Dihindari
- ✕Ignoring lead time variability
- ✕Not updating for seasonal demand changes
Pertanyaan yang sering diajukan
Why is reorder point important?
Prevents stockouts by triggering orders in advance, accounting for lead time.
How does lead time affect reorder point?
Longer lead times require higher reorder points and more safety stock.
Siap menghitung? Coba Kalkulator Reorder Point gratis
Cobalah sendiri →